WAS $15,000. 2 sets of stock off-grid construction drawings and 1 set of off-grid Mechanical Drawings and 1 set of Detail drawings. Usually you don’t have to submit the detail and mechanical drawings with the permit application.

  • Includes 1 hour consultation with Michael Reynolds