bottom course is leveled in. First two courses use 3/4″ gravel to pound with.

Use plastic in bottom of tires of first two courses. Perforate with holes.

Use a builder’s level to ‘shoot-in’ either side of the building as the walls go up. Make sure everything is level.

video live March 18, 9am