• Rough Layout of building
  • Leveling of building pad.
  • Delivery of initial materials.
    • dirt
    • gravel
    • sand/gravel mix
    • cisterns
    • cooling tubes
    • cement
    • concrete sand
    • water
    • cardboard
    • plastic
    • tires
    • hand tools
    • electricity
    • site level